I have been lurking here for about a year gathering info and am getting ready to start on my system once the weather allows.
I have had 2 companies do layouts and they differ a little, probably just their personal preferences. Here's the main info:
Running off a 1 hp. well that also supplies my house, 21-22 gpm, don't know the pressure for sure, 2-2.25 acres when finished, 22-23 zones, 7 Hunter PGPs per zone, 1 or 2 zones of sprays, Blazing saddles, Hunter PGV valves, Hunter ICC controller.
Questions:
1. I am going to run a PVC mainline 2 different directions from my well. 1 leg will be 150' and the other will be close to 320'. Should I go with 1.5" or stick with 1.25"? The zones will be 1" poly with about 33' head spacing.
2. I'm not sure what to do about a backflow device. About 10 heads will be about 6' above where the well is and I don't want to mount something way up in the air.
3. From the Blazing Saddle to the head, is it a big loss to step from 1" poly to 1/2" funny pipe and then back to the 3/4" PGP, or should I go from 1" poly straight to 3/4"? I'm worried about the long runs from the well.
4. Can I install a main valve between the well and the irrigation system that opens only when the sprinkler system comes on? I don't want to pressurize the entire system everytime one of my daughters takes a shower or we run the washing machine. I can install a manual ball valve to shut off during the winter.
I have more but these are the main ones.
I appreciate any and all help. If you have any suggestions on using different heads, valves, etc., I'm open to that also.