Lat and Main line question(s)
****o, I am currently designing my system and have a few questions.
1) I have a 1" main feed from my house and I want to hook a four valve system at this point after the back flow and the winterizing quick connector. I will have several zones that will also have a zone manifold. This is so I can continue to keep sub zones running in the event I have to work on another, Is this the best way to do this or is it over kill?
2) my lawn is framed by 10' wide bark with all types of flowers, trees, shrubs, etc. I don't want to put rotors her because they would be to close to the shrubs and block water. Is is ok to run two lines from a 4 zone manifold where one will supply the barked area with spray heads and one line to supply the lawn area with rotors? Both will run at different times. This is the same for the front, back and sides of the house.
3) I have 1" Maine with 17 GPM. I worked with the contractor to put in a pump that would handle the layout. (submersible) Should I use 3/4 lat lines or should I use 1" lat lines? If I use 3/4 lat lines should I come off of this with 1/2 funny pipe to the heads? or can I just use 1" all the way to the heads?
Thanks for your feedback
Bos