You are not logged in.

Jonathan8383

Starting Member

Posts: 1

Location: Hesperia, ca

1

Sunday, March 10th 2019, 11:47pm

Irrigation line

Hello
I'm running a main line with regulator to 50psi, a 3/4 apollo rpz model 694alf205a2b, schedule 40 pvc, n 3/4 rainbird cpf075 inline valves. The goal is to get to 600', and was wondering if I will have issues putting a drip system down at the end of all my valves(11). Box says 15-150psi for valves, is there going to be enough pressure at 600' to run everything properly with 50psi from backflow. Drop line has to spit out 25psi at 600'

Similar threads

Rate this thread