You are not logged in.

Jim81501

Starting Member

1

Sunday, July 9th 2017, 2:41pm

RB ESP Controller Program 3 zones run every 2 days and 1 zone everyday.

Using the RainBird ESP Controller. I have 4 zones. I want to program 3 zones to run every other day (using advanced cycles) and have the remaining zone run every day.

I used program A to set the 3 zones to run every other day. I programmed program B to run every day. The problem is when I change the times for either program they sync between all programs. That is to say, when I change program B to run every day, program A then runs every day also. I'm stumped. ?(

Rate this thread