Make the tie-in first and then measure what is produced - that way you assume nothing. Then you can design your system.
Wet_Boots
Thanks for this suggestion.
My plan was to have the backflow installed and then test for GPM and pressure.
The design specification is all done.
All I need to do is to verify GPM and pressure.
I am meeting with the local expert today to go over details.