You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 930 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 2 posts

Sunday, April 8th 2012, 2:37pm

by mrfixit

Pro-C ManualHere's your manual.
Odd and Even days are exactly what they sound like. April 2nd = even day. April 1st = odd day.
The date determines odd and even.
This is a good way to water if you want to water every other day. Of course at the end of the month you may have two days in a row water.
If you want to run on specific days of the week then ignore the odd and even days. Just program each individual day you want to water.

Sunday, April 8th 2012, 10:35am

by jack z

Hunter Pro C

I lost the owners book, having trouble re setting the time change and messed up the timmer. What is the difference between the odd & even days what is a even day. The water days show a rain drop eith a cover over it, means a no water day. I,m still confused. Thank you jack z.