You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 1274 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 2 posts

Tuesday, March 22nd 2011, 10:04pm

by Mitchgo

What kind of controller do you have?

It sounds like you have a second start time on your program. Most newer model controllers have stackable programming

For Example

If you have 4 zones that have the run time of 10 minutes each- your total run time is 40 min.

If you have Program A with a start time 1 or 8AM- it will water the 40 minutes. Well this program , can have more start times. If you have a start time 2 at 8AM again. The controller does what is called stackable programming. It will finish Start time 1 , then revert back to start time 2..

Please read your manual to understand this more clearly.

Go through your programming and make sure you have ONLY 1 start time on your program

Tuesday, March 22nd 2011, 8:56pm

by KNARFY

No auto shutoff

I have 4 zones which work fine in manual mode. All 4 zones sequence properly in automatic except that when zone 4 finishes the sequence begins again. It doesn't seem to matter which days of the week are selected ( Tue, Thur, Sun are my prescribed watering days).