You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 3162 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 2 posts

Thursday, March 30th 2006, 10:25pm

by Wet_Boots

Offhand, I'd say you want a larger supply line, depending on whether the drawdown level is 70 feet, or maybe less. Drawdown level gives you the point from which you can read a pump performance curve. You can probably expect at least 20 gpm from the well. The well driller should supply you with all the relevant information. An undersized supply pipe will cost you water pressure, pressure that you're paying for. Any additional cost is a one-time expense. The energy savings are forever. Make it 1 1/2" at a minimum.

A very rough ballpark estimate for an acre lot would be 6 thousand.

Thursday, March 30th 2006, 2:17pm

by baybridge

New system

I have a very irregular shaped lot approx. 1 acre in size located in southern Delaware. I am having a well drilled before I get a sprinkler contractor. Well guy says he can install 1 1/2 H.P. pump into 4 inch casing with well depth approx. 70 feet. He says that will be sufficient to supply 5 or 6 zones using 5 to 6 rotors per zone. The supply line to the zone manifold will be 1 1/4" running 100 feet from well head to manifold. Is this sufficient? Anyone have a ballpark estimate of what I should expect to pay srinkler contractor for this installation? Will be getting estimates in a couple of weeks.Thanks.