Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.
Attention: The last reply to this post was 2879 days ago. The thread may already be out of date. Please consider creating a new thread.
The last 6 posts
It will make you love it that much more when somthing goes your way.
I can relate. We just moved into a new place and I am in the process of installing a 16 zone 60 head system.
Down here in Texas we have some kind of dirt called gumbo that is like rubber clay. Boy is that fun. Im cleaning out the trenches using a 3 inch shovel; its like digging with a screw driver. LOL
Oh well, its fun but it will be more fun once its done.
Who knew that digging in the sandbox back in nursery school was actually job training?
Ahh..isn't working in the irrigation field just a dream come true [:p]
<div align="right"><font color="purple"><b>Are you having fun yet?</b></font id="purple"></div id="right">
Now I Know Why This Is Taking So Long
No real question here, just groning about more issues that keep slowing me down.
I'm working on installing a combination sprinkler system and drip irrigation system, 4 zone sprinkler system for the yard and 4 zone drip irrigation system.
It's taking me FOREVER to get this thing done, and last night was a reminder WHY...
Last night, all I wanted to do was place a 3" x 8' PVC sleave in the ground 6"-8" deep between the bushes and the side-walk. I figured it couldn't take more than about 2 hours.
<b>IT TOOK 5+ HOURS</b>
Apparently when they poured the side walk, they didn't have the ground built up near the front door. There were sections of concrete 6+ inches thick that had oozed out under the forms when they poured the side walk. Now normally, a sledge hammer is more than enough to break up even a thick section of concrete, but the bushes already overhand the side walk. I had to under-cut the bottom of the bushes just to get access to the ground. But that ment I was working at an angle, and I just couldn't get the hammer in there to clear the exceess concreate. And I couldn't just move the trench farther away from the side-walk because I was already running into major roots from the bushes.
My schedule and weather are only allowing me an average of 3 to 4 hours per day for 3 to 4 days per week. When I keep running into things like this that keep slowing me down, it's going to take me 3 to 4 years to get this project completed.