You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 3085 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 2 posts

Tuesday, July 11th 2006, 5:47am

by DOORZ

I imagine each location is different, but where I live the ONLY thing the county cared about was the backflow device. They could care less about the irrigation system. Where I live they didn't require any plans, the only requirement was that the backflow device be installed properly.

I got my permit, installed by backflow device, ran a section of mainline (capped it), and got it inspected weeks before i even began to install my system.


I would call the county/city and ask specifically what they require for plans.

Tuesday, July 11th 2006, 5:31am

by dlp710

Sprinkler Permit Plan

I have decided to install a sprinkler system on my own. I am in process of applying for a permit and the township has requested that I install a backflow preventer in my system and provide plans along with the permit application. I have designed my system thoroughly, but am not clear on what plans the township expects from me - I assume just a diagram on the connection to the main and the location of the backflow preventer.

Could someone with experience in this area describe to me what the plans should detail or idealy, provide a sample of your plans that you submitted to your township. I am in no rush to install the system but I'd like to keep the permit turmoil down to a minimum.

Thanks