You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 3 posts

Monday, March 24th 2014, 12:55pm

by Fabio (Guest)

Thank You!!!

Pr = (96.25 X Total GPM )/ Total Area (sq.ft)

Pr...precip rate
96.25.......constant
Total GPM.....Add total GPM of heads in area. .4 GPM
Total Area.....5x15=75sq.ft

Precip rate for your scenario yields a rate of 0.51" per hour.
Thank You!!!

Monday, March 24th 2014, 10:31am

by Central Irrigation

Pr = (96.25 X Total GPM )/ Total Area (sq.ft)

Pr...precip rate
96.25.......constant
Total GPM.....Add total GPM of heads in area. .4 GPM
Total Area.....5x15=75sq.ft

Precip rate for your scenario yields a rate of 0.51" per hour.

Monday, March 24th 2014, 8:18am

by Fabio (Guest)

Precipitation Rate of MPRCS515

I would like to know how to calculate the precipitation rate for MPRCS515. I am planning on having the following configuration:
@----------------
| |
----------------@
35PSI working pressure, area 5' x 15', 2 heads located diagonally opposed.