You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 4073 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 9 posts

Monday, June 2nd 2003, 12:33pm

by tlflorek

I was planning to use Sch 40 or 80 from the backflow preventer to the valves and poly from the valves to the heads. I assume that if the requirement is Sch 40 then Sch 80 is OK. Again, the concern here is the exposure to UV as it runs through the mulched flower beds.

Terry

Tuesday, May 27th 2003, 5:31pm

by RVLI

It is a requirement in my town that you use shedule 40 PVC upstream of the valves, in other words, the mainline. There is no regulation for pipe after the valves, but around here I have never seen any systems except for very large commercial projects that have been installed with PVC after the valves. Most use poly in northern climates.

Where do you want to use the sched. 80 or 40 PVC? Mainline or laterals?


Tuesday, May 27th 2003, 4:07pm

by tlflorek

If one were wanting to use pvc, which is the correct pipe to use, sch 40 or 80? I've heard the 80 holds up better to UV. Some of my runs will be above ground through mulched flower beds. The dark color would hide better.

Terry

Tuesday, May 27th 2003, 12:19pm

by RVLI

Benifits-
Easier to install, no glue, primer, no need to trench it in (you can pull poly in, but you can also pull in PVC) I use blazing saddle tee's, once in a while just regular saddles.
I would go with poly since you live in Ohio. There are really no disadvantages that I have ever noticed.

Very cheap...I can get a roll or 100' of 1" poly for 20-25.00


Tuesday, May 27th 2003, 8:10am

by TMD

No, I don't have PVC installed already.

What is the benefit of using poly over PVC? I've heard the freezing issue mentioned, but what exactly is the benefit of using poly in freezing climates?

Are there other benefits? I think PVC wins out on price right?

BTW, i'm in Ohio.


Friday, May 23rd 2003, 3:31pm

by drpete3

Do you already have the pvc in the ground? If not then consider poly.


Thursday, May 22nd 2003, 12:40pm

by RVLI

Better yet, if you live in a northern climate, you can install poly and use saddle tees or blazing saddle tees. The what I use for a riser is either cutoff riser, swing joint, or flexible swing joint(funny pipe)


Thursday, May 22nd 2003, 3:31am

by drpete3

I would place a T at every location that you need a sprinkler. Then glue in a 3/4" fpt insert. Then use elbow funny pipe inserts along with funny pipe to make the connection.


Thursday, May 22nd 2003, 3:01am

by TMD

Sprinkler to Mainline Connection

What's the best way to connect from 1" PVC supply lines to
the sprinkler heads themselves?