You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 918 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 4 posts

Thursday, June 14th 2012, 7:19pm

by teamo

Rainbird ESP modular controller will do what you want.

Monday, June 4th 2012, 1:55pm

by GatorGuy

If it has multiple programs then you could set each program to start at a different time on the same day.
Basically, A starts at 6 am, runs complete.
Then B starts at 8 am, runs complete,
C starts at 10 am.
The programs will stack, so if you set B too early it won't make a difference. Still finish A first.
Your system doesn't have a delay or soak cycle that I can find.

Monday, June 4th 2012, 1:52pm

by Wet_Boots

That controller will not be able to give you a delay between zones - try a Hunter Pro-C

Monday, June 4th 2012, 1:25pm

by rwittman

Delay times.

I just drilled a well and it's only producing about 7-8 gal / min.

I have adjusted nozels and can run the well for about 10 min at a time.

My Nelson Control doesn't allow delay times.......I think.

It is a Nelson EZ Pro Jr.

I would like to have 20 minutes delay between each zone. Is this possible.

The system was put in new in 2006 and is a 12 zone system. I can program 9 different start times but I can't seem to figure out how to program a delay time. Does Nelson do this ?

Thanks.