You are not logged in.

Reply

Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Attention: The last reply to this post was 1244 days ago. The thread may already be out of date. Please consider creating a new thread.

Message information
Message
Settings
Automatically converts internet addresses into links by adding [url] and [/url] around them.
Smiley code in your message such as :) is automatically displayed as image.
You can use BBCode to format your message, if this option is enabled.
Security measure

Please enter the letters that are shown in the picture below (without spaces, and upper or lower case can be used).

The last 2 posts

Sunday, June 5th 2011, 8:05am

by Wet_Boots

You need to create a second program for the 1600 start time, and assign zones 3 and 5 to it

Saturday, June 4th 2011, 11:05pm

by salake

Programing a Rainbird Controler for different value operations at different times on the same day.

I have a new Rainbird Controller with 5 zones in the system. I wish to start at 0400 an run all zones. At 1600 I wish only to run zones 3 & 5. I wish to do this on Sunday, Tuesday and Thursday. How do I accomplish this?