Reply
Dear visitor, welcome to SPRINKLER TALK FORUM - You Got Questions, We've Got Answers. If this is your first visit here, please read the Help. It explains how this page works. You must be registered before you can use all the page's features. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.
Attention: The last reply to this post was 2568 days ago. The thread may already be out of date. Please consider creating a new thread.
The last 2 posts
Use the MV terminal - Master Valve is the same as Pump
new controller
My old controller died. It was a Richdel 8 zone model 508PR. This model also has a pump wire connection along with the zone wires and common wires. I replaced it with a Hunter 9 zone SRC Plus, and I notice no place to connect the pump wire. The manual shows that it can be connected to a seperate pump start relay. Do I need to purchase one of the pump start relays or is there a place on this controller to connect the pump wire? The directions are a little unclear.